Structure Design and Construction Requirements Analysis of the Post-Pouring Strip Based on Data Mining Technology

Authors

  • Yuan Zang

Abstract

A post-pouring strip is a temporary construction joint in the corresponding position of foundation floor, wall and beam in order to prevent harmful cracks caused by uneven shrinkage or uneven settlement of cast-in-place reinforced concrete structure in construction. A post-pouring strip can solve the problem of settlement cracks, concrete shrinkage deformation and temperature stress caused by cracks in the construction project. It plays an important role in simplifying the structural design of a construction project, shortening the construction period, advancing the construction progress and saving investment. This paper proposes the use of data mining technology to process and analyze the data on post-pouring strip structure design and the construction process and discusses the role of the post-pouring strip in a concrete floor, including the spacing, width and closing time of
post-pouring strips.

Keywords: Public art; Interactive experience; Information interaction model

CiteĀ  As

Y. Zang, "Structure Design and Construction Requirements Analysis of the Post-Pouring Strip Based on
Data Mining Technology", vol. 30 no. 4, pp. 299-303, 2022.




Published

2022-07-01